Skip to main content
FAA facility Airport

ROSECRANS MEML

ST JOSEPH, MISSOURI FAA STJ ICAO KSTJ Open to the public

Runways

2 records · drawn to relative scale
13/31 4,797 × 75 ft · Concrete (excellent) · Medium-intensity edge lights
Runway-end details
Runway 13/31 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
13 136° — PAPI · 4-light · left side — — TORA 4,797 · TODA 4,797 · ASDA 4,797 · LDA 4,797
31 316° — PAPI · 4-light · left side — — TORA 4,797 · TODA 4,797 · ASDA 4,797 · LDA 4,797
17/35 8,061 × 150 ft · Concrete (good) · High-intensity edge lights
Runway-end details
Runway 17/35 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
17 180° — PAPI · 4-light · left side — — TORA 8,061 · TODA 8,061 · ASDA 8,061 · LDA 8,061
35 0° ILS PAPI · 4-light · left side — — TORA 8,061 · TODA 8,061 · ASDA 8,061 · LDA 8,061

Communications

20 published frequencies
Published communications frequencies
UseFrequencyHours
STJ VORTAC115.5/102X—
APCH/P DEP/P120.35WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM
BRAYMER STAR120.95—
JHAWK STAR120.95—
TYGER STAR120.95—
EMERG121.5WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM
GND/P IC121.9WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM
UNICOM122.95—
APCH/P DEP/P124.7—
ATIS125.05WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM
STJ ASOS125.05—
CTAF126.9—
Show 8 more frequencies
LCL/P IC126.9WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM
LCL/P239.0WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM
EMERG243.0WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM
APCH/P DEP/P284.7—
BRAYMER STAR318.1—
JHAWK STAR318.1—
TYGER STAR318.1—
APCH/P DEP/P360.8WED-THU 0800-0000, FRI-TUE 0800-1800, OT BY NOTAM

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
35 ILS I 110.3 Operational ifr

FAA listing history

Identities observed in NASR snapshots
ROSECRANS MEML Observed 2024-06-13 through 2026-07-09 KSTJ

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles

No public material changes are recorded yet.

FAA NASR cycle effective 2026-10-01. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.