Skip to main content
FAA facility Airport

PATRICK LEAHY BURLINGTON INTL

BURLINGTON, VERMONT FAA BTV ICAO KBTV Open to the public

Runways

2 records · drawn to relative scale
01/19 4,112 × 75 ft · Asphalt (good) · Medium-intensity edge lights
Runway-end details
Runway 01/19 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
01 351° PAPI · 4-light · left side 225 ft TORA 3,611 · TODA 3,611 · ASDA 3,611 · LDA 3,386
19 171° PAPI · 4-light · right side 500 ft TORA 4,111 · TODA 4,111 · ASDA 4,111 · LDA 3,386
15/33 8,319 × 150 ft · Asphalt / concrete (good) · High-intensity edge lights
Runway-end details
Runway 15/33 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
15 131° ILS/DME PAPI · 4-light · right side MALSR Medium-intensity ALS with runway alignment lights TORA 7,820 · TODA 7,820 · ASDA 7,820 · LDA 7,820
33 311° ILS/DME PAPI · 4-light · right side MALSF Medium-intensity ALS with sequenced flashers 500 ft TORA 8,320 · TODA 8,320 · ASDA 8,320 · LDA 7,820

Communications

28 published frequencies
Published communications frequencies
UseFrequencyHours
BTV VOT109.0
BTV VOR/DME117.5/122X
CTAF118.3
LCL/P118.30530-0000
CD/P119.150530-0000
ST. ALBANS RCAG120.35
APCH/P DEP/P121.10530-0000
CLASS C121.10530-0000
EMERG121.50530-0000
BURLINGTON RCO122.2
UNICOM122.95
ARNG OPS123.30530-0000
Show 16 more frequencies
ATIS123.80530-0000
BTV ASOS123.8
GND/P126.30530-0000
ARNG OPS134.10530-0000
ARNG OPS242.40530-0000
EMERG243.00530-0000
LCL/P257.80530-0000
ATIS269.90530-0000
APCH/P DEP/P278.80530-0000
CLASS C278.80530-0000
LCL/S290.90530-0000
ANG OPS293.70530-0000
ST. ALBANS RCAG342.25
GND/P348.60530-0000
LCL/S388.20530-0000
ARNG OPS41.20530-0000

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
15 ILS/DME I 110.3 Operational restricted
33 ILS/DME I 110.3 Operational restricted

FAA listing history

Identities observed in NASR snapshots
PATRICK LEAHY BURLINGTON INTL Observed 2024-06-13 through 2026-07-09 KBTV

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles

No public material changes are recorded yet.

FAA NASR cycle effective 2026-08-06. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.