FAA facility Airport
LEHIGH VALLEY INTL
ALLENTOWN, PENNSYLVANIA FAA ABE ICAO KABE Open to the public
Runways
2 records · drawn to relative scale
06/24
06
24
Runway-end details
| End | True hdg | ILS | Glide slope aid | Approach lights | Displaced thr | Declared distances |
|---|---|---|---|---|---|---|
| 06 | 51° | ILS | PAPI · 4-light · left side | MALSR Medium-intensity ALS with runway alignment lights | — | TORA 7,599 · TODA 7,599 · ASDA 7,599 · LDA 7,599 |
| 24 | 231° | ILS/DME | PAPI · 4-light · right side | — | 510 ft | TORA 7,599 · TODA 7,599 · ASDA 7,599 · LDA 7,089 |
13/31
13
31
Runway-end details
| End | True hdg | ILS | Glide slope aid | Approach lights | Displaced thr | Declared distances |
|---|---|---|---|---|---|---|
| 13 | 123° | ILS | — | MALSR Medium-intensity ALS with runway alignment lights | — | TORA 5,800 · TODA 5,800 · ASDA 5,800 · LDA 5,800 |
| 31 | 303° | — | PAPI · 4-light · left side | — | — | TORA 5,800 · TODA 5,800 · ASDA 5,800 · LDA 5,800 |
Communications
18 published frequencies| Use | Frequency | Hours |
|---|---|---|
| APCH/P DEP/P IC | 119.65 | 24 |
| CLASS C | 119.65 | 24 |
| LCL/P | 120.5 | 24 |
| EMERG | 121.5 | 24 |
| GND/P | 121.9 | 24 |
| UNICOM | 122.95 | — |
| CD/P | 124.05 | 24 |
| APCH/P DEP/P | 124.45 | 24 |
| APCH/P DEP/P IC | 124.45 | 24 |
| CLASS C | 124.45 | 24 |
| ATIS | 126.975 | 24 |
| ABE ASOS | 126.975 | — |
Show 6 more frequencies
| EMERG | 243.0 | 24 |
| CD/P | 257.95 | 24 |
| GND/P | 257.95 | 24 |
| LCL/P | 257.95 | 24 |
| APCH/P DEP/P IC | 351.8 | 24 |
| CLASS C | 351.8 | 24 |
Instrument landing systems
NASR ILS_BASE records| Runway end | System | Category | Frequency | Status |
|---|---|---|---|---|
| 06 | ILS | I | 110.7 | Operational ifr |
| 13 | ILS | I | 111.9 | Operational ifr |
| 24 | ILS/DME | I | 108.55 | Operational ifr |
FAA listing history
Identities observed in NASR snapshots
LEHIGH VALLEY INTL
Observed 2024-06-13 through 2026-07-09
KABE
Dates describe available FAA snapshots, not exact opening, closure or construction dates.
Material changes
First observed in NASR cyclesNo public material changes are recorded yet.
FAA NASR cycle effective 2026-10-01. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.