Skip to main content
FAA facility Airport

LAKEFRONT

NEW ORLEANS, LOUISIANA FAA NEW ICAO KNEW Open to the public

Runways

3 records · drawn to relative scale
09/27 3,114 × 75 ft · Asphalt (fair) · Medium-intensity edge lights
Runway-end details
Runway 09/27 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
09 89° PAPI · 4-light · left side TORA 3,113 · TODA 3,113 · ASDA 3,113 · LDA 3,113
27 RP 269° PAPI · 4-light · right side TORA 3,113 · TODA 3,113 · ASDA 3,113 · LDA 3,113
18L/36R 3,697 × 75 ft · Asphalt (good) · Medium-intensity edge lights
Runway-end details
Runway 18L/36R end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
18L 179° TORA 3,697 · TODA 3,697 · ASDA 3,697 · LDA 3,697
36R RP 359° PAPI · 4-light · left side TORA 3,697 · TODA 3,697 · ASDA 3,697 · LDA 3,697
18R/36L 6,879 × 150 ft · Asphalt (good) · Medium-intensity edge lights
Runway-end details
Runway 18R/36L end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
18R RP 179° ILS/DME PAPI · 4-light · left side MALSR Medium-intensity ALS with runway alignment lights 239 ft TORA 6,880 · TODA 6,880 · ASDA 6,035 · LDA 5,510
36L 359° PAPI · 4-light · left side 820 ft TORA 6,880 · TODA 6,880 · ASDA 5,955 · LDA 5,135

Communications

18 published frequencies
Published communications frequencies
UseFrequencyHours
CTAF118.95
LCL/P118.950700-2100
GND/P121.70700-2100
NEW ORLEANS RCO122.6
APCH/P DEP/P123.85
ATIS124.90700-2100
AWDAD STAR125.5
OLEDD STAR125.5
CD/P127.4
CD/P127.40700-2100
APCH/P DEP/P133.15
MNSTR STAR133.15
Show 6 more frequencies
APCH/P DEP/P256.9
APCH/P DEP/P290.3
MNSTR STAR290.3
GND/P335.5750700-2100
AWDAD STAR350.35
OLEDD STAR350.35

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
18R ILS/DME I 111.3 Operational ifr

FAA listing history

Identities observed in NASR snapshots
LAKEFRONT Observed 2024-06-13 through 2026-07-09 KNEW

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles

No public material changes are recorded yet.

FAA NASR cycle effective 2026-08-06. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.