Skip to main content
FAA facility Airport

KENAI MUNI

KENAI, ALASKA FAA ENA ICAO PAEN Open to the public

Runways

5 records · drawn to relative scale
02L/20R 7,855 × 150 ft · Asphalt (fair) · High-intensity edge lights
Runway-end details
Runway 02L/20R end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
02L RP 31° VASI · 4-box · left side 280 ft TORA 7,855 · TODA 7,855 · ASDA 7,855 · LDA 7,575
20R 211° ILS/DME VASI · 4-box · left side MALSR Medium-intensity ALS with runway alignment lights TORA 7,855 · TODA 7,855 · ASDA 7,575 · LDA 7,575
02R/20L 1,980 × 75 ft · Gravel (good) · Unlighted
Runway-end details
Runway 02R/20L end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
02R 31°
20L 211°
02W/20W 4,600 × 240 ft · Water (good) · Unlighted
Runway-end details
Runway 02W/20W end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
02W
20W RP
H1 55 × 55 ft · Asphalt · Unlighted
Runway-end details
Runway H1 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
H1
H2 55 × 55 ft · Asphalt · Unlighted
Runway-end details
Runway H2 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
H2

Communications

13 published frequencies
Published communications frequencies
UseFrequencyHours
ENA VOR/DME117.6/123X
GND/P118.750600-2200 MAY 1 - SEP 30; 0700-2100 OCT 1 - APR 30
CTAF121.3
LCL/P121.30600-2200 MAY 1 - SEP 30; 0700-2100 OCT 1 - APR 30
ENA FSS121.3
ENA FSS121.5
ENA FSS122.65
KENAI RCAG125.7
ATIS133.350600-2200 MAY 1 - SEP 30; 0700-2100 OCT 1 - APR 30
ENA ASOS133.35
LCL/P239.30600-2200 MAY 1 - SEP 30; 0700-2100 OCT 1 - APR 30
ENA FSS243.0
KENAI RCAG379.1

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
20R ILS/DME I 108.9 Operational ifr

FAA listing history

Identities observed in NASR snapshots
KENAI MUNI Observed 2024-06-13 through 2026-07-09 PAEN

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles
Runway added
Runway added

FAA NASR cycle effective 2026-08-06. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.