Skip to main content
FAA facility Airport

HUDSON VALLEY RGNL

POUGHKEEPSIE, NEW YORK FAA POU ICAO KPOU Open to the public

Runways

3 records · drawn to relative scale
06/24 5,001 × 100 ft · Asphalt (excellent) · High-intensity edge lights
Runway-end details
Runway 06/24 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
06 51° ILS PAPI · 4-light · left side MALSR Medium-intensity ALS with runway alignment lights — TORA 5,001 · TODA 5,001 · ASDA 5,001 · LDA 5,001
24 231° — PAPI · 4-light · left side — 115 ft TORA 5,001 · TODA 5,001 · ASDA 5,001 · LDA 4,886
07/25 1,357 × 100 ft · Turf (good) · Unlighted
Runway-end details
Runway 07/25 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
07 51° — — — — —
25 231° — — — — —
15/33 2,743 × 100 ft · Asphalt / concrete (good) · Medium-intensity edge lights
Runway-end details
Runway 15/33 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
15 139° — — — — TORA 2,743 · TODA 2,743 · ASDA 2,743 · LDA 2,743
33 319° — VASI · 4-box · left side — — TORA 2,743 · TODA 2,743 · ASDA 2,743 · LDA 2,743

Communications

13 published frequencies
Published communications frequencies
UseFrequencyHours
CD/P121.80700-2200 (15 MAY-14 SEP); 0700-2100 (15 SEP- 14 MAY)
GND/P121.80700-2200 (15 MAY-14 SEP); 0700-2100 (15 SEP- 14 MAY)
POUGHKEEPSIE RCO122.2—
UNICOM122.95—
CTAF124.0—
LCL/P124.00700-2200 (15 MAY-14 SEP); 0700-2100 (15 SEP- 14 MAY)
ATIS126.750700-2200 (15 MAY-14 SEP); 0700-2100 (15 SEP- 14 MAY)
POU ASOS126.75—
APCH/P DEP/P132.75—
TRESA STAR132.75—
LCL/P269.150700-2200 (15 MAY-14 SEP); 0700-2100 (15 SEP- 14 MAY)
APCH/P DEP/P363.1—
TRESA STAR363.1—

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
06 ILS I 111.3 Operational ifr

FAA listing history

Identities observed in NASR snapshots
HUDSON VALLEY RGNL Observed 2024-06-13 through 2026-07-09 KPOU

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles

No public material changes are recorded yet.

FAA NASR cycle effective 2026-10-01. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.