Skip to main content
FAA facility Airport

GREATER BINGHAMTON/EDWIN A LINK FLD

BINGHAMTON, NEW YORK FAA BGM ICAO KBGM Open to the public

Runways

3 records · drawn to relative scale
10/28 5,001 × 150 ft · Asphalt (excellent) · Medium-intensity edge lights
Runway-end details
Runway 10/28 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
10 86° VASI · 4-box · left side TORA 5,001 · TODA 5,001 · ASDA 5,001 · LDA 5,001
28 266° VASI · 4-box · left side TORA 5,001 · TODA 5,001 · ASDA 5,001 · LDA 5,001
16/34 7,305 × 150 ft · Asphalt (good) · High-intensity edge lights
Runway-end details
Runway 16/34 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
16 148° ILS PAPI · 2-light · left side MALSR Medium-intensity ALS with runway alignment lights 400 ft TORA 7,305 · TODA 7,305 · ASDA 7,305 · LDA 6,905
34 328° ILS PAPI · 2-light · left side MALSR Medium-intensity ALS with runway alignment lights 205 ft TORA 7,305 · TODA 7,305 · ASDA 7,305 · LDA 7,100
H1 54 × 54 ft · Asphalt (good) · Perimeter lighting
Runway-end details
Runway H1 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
H1

Communications

17 published frequencies
Published communications frequencies
UseFrequencyHours
APCH/P DEP/P IC118.60600-0000
TRSA118.60600-0000
CTAF119.3
LCL/P119.30600-0000
EMERG121.50600-0000
GND/P121.90600-0000
UNICOM122.95
CD/P125.050600-0000
APCH/P DEP/P127.550600-0000
TRSA127.550600-0000
ATIS128.150600-0000
ELK MOUNTAIN RCAG132.175
Show 5 more frequencies
LCL/P239.250600-0000
EMERG243.00600-0000
APCH/P DEP/P IC257.6250600-0000
TRSA257.6250600-0000
ELK MOUNTAIN RCAG298.9

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
16 ILS I 110.3 Operational ifr
34 ILS I 110.3 Operational ifr

FAA listing history

Identities observed in NASR snapshots
GREATER BINGHAMTON/EDWIN A LINK FLD Observed 2024-06-13 through 2026-07-09 KBGM

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles

No public material changes are recorded yet.

FAA NASR cycle effective 2026-08-06. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.