Skip to main content
FAA facility Airport

COLUMBIA METRO

COLUMBIA, SOUTH CAROLINA FAA CAE ICAO KCAE Open to the public

Runways

3 records · drawn to relative scale
05/23 8,001 × 150 ft · Asphalt / concrete (excellent) · High-intensity edge lights
Runway-end details
Runway 05/23 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
05 45° ILS PAPI · 4-light · right side MALSR Medium-intensity ALS with runway alignment lights TORA 8,001 · TODA 8,001 · ASDA 7,001 · LDA 7,001
23 225° PAPI · 4-light · left side 1,000 ft TORA 8,001 · TODA 8,001 · ASDA 8,001 · LDA 7,001
11/29 8,601 × 150 ft · Concrete (excellent) · High-intensity edge lights
Runway-end details
Runway 11/29 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
11 105° ILS/DME PAPI · 4-light · left side ALSF2 High-intensity ALS with sequenced flashers (CAT II/III) TORA 8,601 · TODA 8,601 · ASDA 8,601 · LDA 8,601
29 285° ILS PAPI · 4-light · left side MALSR Medium-intensity ALS with runway alignment lights TORA 8,601 · TODA 8,601 · ASDA 8,506 · LDA 8,506
H1 50 × 50 ft · Concrete (fair) · Perimeter lighting
Runway-end details
Runway H1 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
H1

Communications

19 published frequencies
Published communications frequencies
UseFrequencyHours
CAE VORTAC114.7/94X
LCL/P119.524
CD/P119.7524
ATIS120.1524
EMERG121.524
GND/P121.924
COLUMBIA RCO122.1R
UNICOM122.95
APCH/P DEP/P IC124.1524
CLASS C124.1524
APCH/P DEP/P IC133.424
CLASS C133.424
Show 7 more frequencies
EMERG243.024
LCL/P257.824
APCH/P DEP/P IC285.624
CLASS C285.624
APCH/P DEP/P IC338.224
CLASS C338.224
GND/P348.624

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
05 ILS I 108.95 Operational ifr
11 ILS/DME IIIB 110.3 Operational ifr
29 ILS I 108.3 Operational ifr

FAA listing history

Identities observed in NASR snapshots
COLUMBIA METRO Observed 2024-06-13 through 2026-07-09 KCAE

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles

No public material changes are recorded yet.

FAA NASR cycle effective 2026-08-06. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.