Skip to main content
FAA facility Airport

BOISE AIR TRML/GOWEN FLD

BOISE, IDAHO FAA BOI ICAO KBOI Open to the public

Runways

3 records · drawn to relative scale
10L/28R 10,000 × 150 ft · Asphalt (good) · High-intensity edge lights
Runway-end details
Runway 10L/28R end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
10L 115° PAPI · 4-light · right side TORA 10,000 · TODA 10,000 · ASDA 10,000 · LDA 10,000
28R RP 295° ILS/DME PAPI · 4-light · left side TORA 10,000 · TODA 10,000 · ASDA 10,000 · LDA 10,000
10R/28L 9,763 × 150 ft · Asphalt (good) · High-intensity edge lights
Runway-end details
Runway 10R/28L end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
10R RP 115° ILS/DME VASI · 4-box · left side ALSF2 High-intensity ALS with sequenced flashers (CAT II/III) TORA 9,763 · TODA 9,763 · ASDA 9,763 · LDA 9,763
28L 295° VASI · 4-box · left side MALSR Medium-intensity ALS with runway alignment lights TORA 9,763 · TODA 9,763 · ASDA 9,763 · LDA 9,763
H1 50 × 50 ft · Asphalt (fair) · Unlighted
Runway-end details
Runway H1 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
H1

Communications

24 published frequencies
Published communications frequencies
UseFrequencyHours
BOI VORTAC113.3/80X
BOI VOT116.7
LCL/P IC118.124
LCL/S119.024
APCH/P DEP/P IC119.624
CLASS C119.624
EMERG121.524
GND/P121.724
BOISE RCO122.6
UNICOM122.95
D-ATIS123.924
BOI ASOS123.9
Show 12 more frequencies
CD/P125.924
APCH/P DEP/P126.924
CLASS C126.924
LCL/P257.824
APCH/P DEP/P IC269.424
CLASS C269.424
D-ATIS290.424
ANG OPS298.724
CD/P323.224
GND/P348.624
APCH/P DEP/P351.8524
CLASS C351.8524

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
10R ILS/DME III 111.1 Operational restricted
28R ILS/DME I 110.15 Operational restricted

FAA listing history

Identities observed in NASR snapshots
BOISE AIR TRML/GOWEN FLD Observed 2024-06-13 through 2026-07-09 KBOI

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles
Runway added

FAA NASR cycle effective 2026-08-06. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.