Skip to main content
FAA facility Airport

BILLINGS LOGAN INTL

BILLINGS, MONTANA FAA BIL ICAO KBIL Open to the public

Runways

3 records · drawn to relative scale
07/25 5,501 × 75 ft · Asphalt (good) · Medium-intensity edge lights
Runway-end details
Runway 07/25 end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
07 84° PAPI · 4-light · left side TORA 5,501 · TODA 5,501 · ASDA 5,501 · LDA 5,501
25 264° PAPI · 4-light · right side TORA 5,501 · TODA 5,501 · ASDA 5,501 · LDA 5,501
10L/28R 10,518 × 150 ft · Asphalt (good) · High-intensity edge lights
Runway-end details
Runway 10L/28R end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
10L 111° ILS/DME PAPI · 4-light · left side MALSR Medium-intensity ALS with runway alignment lights TORA 10,518 · TODA 10,518 · ASDA 10,518 · LDA 10,518
28R 291° ILS/DME PAPI · 4-light · right side TORA 10,518 · TODA 10,518 · ASDA 10,518 · LDA 10,518
10R/28L 3,800 × 75 ft · Asphalt (good) · Medium-intensity edge lights
Runway-end details
Runway 10R/28L end details
EndTrue hdgILS Glide slope aidApproach lights Displaced thrDeclared distances
10R 111° TORA 3,801 · TODA 3,801 · ASDA 3,801 · LDA 3,801
28L 291° TORA 3,801 · TODA 3,801 · ASDA 3,801 · LDA 3,801

Communications

17 published frequencies
Published communications frequencies
UseFrequencyHours
BIL VORTAC114.5/92X
APCH/P DEP/P119.224
CLASS C119.224
APCH/P DEP/P IC120.524
CLASS C120.524
EMERG121.524
CD PRE TAXI CLNC121.924
GND/P121.924
BILLINGS RCO122.3
UNICOM122.95
ATIS126.324
BIL ASOS126.3
Show 5 more frequencies
LCL/P127.224
EMERG243.024
LCL/P257.824
APCH/P DEP/P284.624
CLASS C284.624

Instrument landing systems

NASR ILS_BASE records
Instrument landing system records
Runway endSystemCategory FrequencyStatus
10L ILS/DME I 111.5 Operational ifr
28R ILS/DME I 111.5 Operational restricted

FAA listing history

Identities observed in NASR snapshots
BILLINGS LOGAN INTL Observed 2024-06-13 through 2026-07-09 KBIL

Dates describe available FAA snapshots, not exact opening, closure or construction dates.

Material changes

First observed in NASR cycles

No public material changes are recorded yet.

FAA NASR cycle effective 2026-08-06. Operational information changes every cycle — consult current FAA publications, the Chart Supplement and NOTAMs before flight.